nexus-weave.vercel.app
Nexus Weave — Browser-native WebMCP dependency graph untangler. Zero-egress AI tool server for microservice architecture visualization.
First seen 2026-11-05 · Last seen 2026-11-05 · Source: webmcp.com
Answer 1 · Act 4 · Transact 0 · Score: Not yet scored
Tool inspector
compute_critical_path
Calculates the longest latency execution path in the DAG. Call this when evaluating system latency bottlenecks.
Input schema
| Property | Type | Required | Description |
|---|---|---|---|
duration_field |
string | yes | Name of the field on each node holding its duration value. |
Raw JSON schema
{
"type": "object",
"properties": {
"duration_field": {
"type": "string",
"minLength": 1,
"maxLength": 64,
"description": "Name of the field on each node holding its duration value."
}
},
"required": [
"duration_field"
],
"additionalProperties": false
}
Similar websites
morphus.myles4miles.chatgpt.site
Morphus is an AI-native workspace for designing worlds and generating playable game experiences.
damnpdfs.com
Install the DamnPDFs Codex plugin, pair a browser workspace and use PDF, image and file tools from your coding agent. Includes setup and privacy limits.
insignifi4nt.github.io
broCAD/M: local-first CAD and CAM for parametric design, wire EDM planning, simulation and controller export.
cabinet.varera.studio
The Cartographer's Cabinet