anastatica.pages.dev
Enterprise inventory portal instrumented by Anastatica: full-lifecycle web performance diagnostics for browser AI agents.
First seen 2026-11-05 · Last seen 2026-11-05 · Source: webmcp.com
Answer 0 · Act 7 · Transact 0 · Score: Not yet scored
Tool inspector
audit_network_critical_path
Ranks critical-path resources by cost and proposes a 103 Early Hints preload set.
Input schema
| Property | Type | Required | Description |
|---|---|---|---|
limit |
integer | no | Maximum number of resources to report, highest cost first. |
Raw JSON schema
{
"properties": {
"limit": {
"default": 50,
"description": "Maximum number of resources to report, highest cost first.",
"format": "uint32",
"minimum": 0,
"type": "integer"
}
},
"title": "AuditNetworkParams",
"type": "object"
}
Similar websites
morphus.myles4miles.chatgpt.site
Morphus is an AI-native workspace for designing worlds and generating playable game experiences.
damnpdfs.com
Install the DamnPDFs Codex plugin, pair a browser workspace and use PDF, image and file tools from your coding agent. Includes setup and privacy limits.
insignifi4nt.github.io
broCAD/M: local-first CAD and CAM for parametric design, wire EDM planning, simulation and controller export.
cabinet.varera.studio
The Cartographer's Cabinet