Microsoft Project
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
Claim this listing if you maintain it — self-service via owners.json or a one-time proof file.
How to connect
Same URL, five paste targets. Thin listing · Local only. Not a safe-to-install badge.
No remote URL or npx install command on this listing.
No remote URL or npx install command on this listing.
This listing has no public HTTPS MCP URL. Claude and ChatGPT connectors cannot reach localhost / stdio. Use Cursor or Claude Code, or ask the vendor for a remote endpoint.
This listing has no public HTTPS MCP URL. Claude and ChatGPT connectors cannot reach localhost / stdio. Use Cursor or Claude Code, or ask the vendor for a remote endpoint.
This listing has no public HTTPS MCP URL. Claude and ChatGPT connectors cannot reach localhost / stdio. Use Cursor or Claude Code, or ask the vendor for a remote endpoint.
This listing has no public HTTPS MCP URL. Claude and ChatGPT connectors cannot reach localhost / stdio. Use Cursor or Claude Code, or ask the vendor for a remote endpoint.
No install command or remote URL on this listing.
No HTTPS URL or parseable npx command to put in mcpServers.
Paste into a README or docs site. The widget loads snippets from Influzer — still not a SAFE badge.
<div data-influzer-install="io-github-horizungroup-horizun-msproject-mcp"></div>
<script async src="https://www.influzer.ai/embed/install.js"></script>
https://www.influzer.ai/embed/mcp/io-github-horizungroup-horizun-msproject-mcp.md
JSON: https://www.influzer.ai/api/v1/install/io-github-horizungroup-horizun-msproject-mcp
Recipes using this server
No published recipes yet for this server.
Listing quality
Observable facts from our catalog and daily probe — not a safe-to-install badge.
- Surface
- Thin listing
- Live handshake
- Local only
- Auth gate
- Auth unknown
- Tools source
- No tools indexed
Listing facts only — handshake the live tools/list before you connect. How we verify.
Verification summary
Stored signals only. Not a safety score.
- Verification grade
- D (30)
- Last verified
- Status
- Local only
- Auth
- Auth unknown
- Transport
- stdio, HTTPS
- Tools indexed
- 0
Tools
No indexed tools yet — treat this as an unverified listing. Handshake the live tools/list before you connect.